Lot Coverage Calculation for Building Permits: The Complete 2026 Guide

Lot Coverage Calculation for Building Permits: The Complete 2026 Guide

🆕 2026 Update Florida HB 803 (effective July 1, 2026) exempts certain residential work valued under $7,500 from permit requirements but lot coverage rules still apply to all permitted construction. Colorado HB 1114 (2026) limits the ability of local governments to enforce lot coverage rules that restrict housing density. See your state section below for […]

Orange County Florida Permit Site Plan and FastTrack Guide

Orange County Florida permit site plan with FastTrack online portal, residential home blueprint, construction plans, and permitting guide.

An orange county florida permit site plan is commonly required when a project changes the location, footprint or use of improvements on a property. Depending on the work, the plan may need to show property lines, easements, rights-of-way, existing structures, proposed construction and exact distances to parcel boundaries. Applications for projects under Orange County jurisdiction […]

HVHZ Permit Requirements: Miami-Dade and Broward — The Complete 2026 Guide Focus

HVHZ Permit Requirements Florida illustration with site plan, Florida map, and hurricane design details.

Two counties in the entire United States carry the HVHZ designation. Both of them are in Florida. Miami-Dade County and Broward County are the only High-Velocity Hurricane Zone jurisdictions in the country. Every other Florida county — Palm Beach, Hillsborough, Orange, Lee, Pinellas, Sarasota, all of them — operates under the standard Florida Building Code. […]

Lee County Permit Site Plan: Requirements for a Complete Submission

Lee County permit site plan concept showing a Florida home with a detached ADU on a waterfront residential property.

A Lee County permit site plan is a scaled drawing showing the property boundaries, existing conditions, proposed construction, setbacks, easements, access, and other information needed to review a building-permit application. It helps county staff verify that the work is proposed on the correct parcel and complies with zoning, floodplain, building, and site-development requirements. The first […]

ADU Site Plan Florida SB 943: What the Law Actually Requires

ADU Site Plan Florida SB 943 showing a Florida home with a detached backyard ADU and site layout.

Searching for ADU site plan Florida SB 943 usually leads to claims that a 2025 state law made accessory dwelling units legal on almost every single-family lot. That statement is inaccurate. Florida considered proposals that would have expanded statewide ADU rights, but those provisions did not become the current statewide rule. In 2026, ADU eligibility […]

Fence Permit Site Plan Florida: Drawing Requirements and Local Rules

Professional fence permit site plan Florida transitioning into a 3D home with property boundaries, vinyl fence, gates, setbacks, and easement lines.

A fence permit site plan Florida is a scaled property drawing showing the proposed fence line, gate locations, fence height, property boundaries, easements, driveways, streets, and existing structures. The reviewing authority uses it to verify placement, zoning, visibility, access, and safety compliance. Florida does not have one universal fence permit rule for every property. A […]

Phoenix Shed & Accessory Structure Permit Rules: What Homeowners Must Know

Phoenix Shed & Accessory

Building a backyard shed in Phoenix seems like a weekend project until the building department asks a question you weren’t ready for: how far is it from your property line, and does it count toward your lot coverage? Many homeowners assume “small shed” automatically means “no permit needed,” and that assumption is exactly where Phoenix […]

A Contractor’s Guide to Avoiding Permit Delays on Multiple Job Sites

Contractor’s Guide to Avoiding

Running one job site is hard enough. Running four or five at once, each sitting in a different county’s permit queue, is where most contractors lose weeks they never get back. A crew shows up ready to frame, and the permit for that address is still sitting in “under review.” Materials are on order. The […]