Your city asked for a site plan before approving your building permit. You need it fast, formatted correctly, and accurate enough to pass first-time review. That's exactly what we prepare.
Every plan is drawn to scale, researched for your county, and formatted for your building department portal — starting from just $79.
Pool, fence, deck, shed, addition, ADU, garage — any residential project that needs a permit. GIS-verified, county-formatted, delivered in 12–24 hours.
Full commercial permit packages including parking layout, ADA spaces, fire lanes, drainage notes, and PE stamp for jurisdictions that require engineer sign-off.
Some jurisdictions — especially commercial, ADU, and structural projects — require a Professional Engineer's stamp. We provide PE-stamped site plans for any state.
A site plan for a permit is a scaled, top-view drawing of your property. The building department uses it to confirm your project complies with local zoning rules — setbacks and lot coverage. Without it, there's nothing to review.
Required by every US building department without exception. Missing even one element causes a rejection and delays your permit.
All lot lines measured in feet with dimensions labeled
County property identifier — must match records exactly
From county appraiser records, adjacent street names
Written scale AND graphic scale bar — both required
Every structure on the lot, dimensioned — GIS cross-checked
Labeled "PROPOSED," dimensioned, all four setbacks shown
Address, APN, owner name, preparer, date, scale
Required for pools, decks, driveways, and most additions
Every order includes GIS-verified data, county-specific setback research, and correct formatting for your building department portal.
| Project Type | Turnaround | Complexity | Action |
|---|---|---|---|
| Pool or Spa | 12–24 hrs | Medium | Order → |
| Fence or Wall | 12 hrs | Simple | Order → |
| Shed or Accessory Structure | 12 hrs | Simple | Order → |
| Deck or Patio | 12–24 hrs | Simple | Order → |
| Home Addition | 24 hrs | Medium | Order → |
| Garage — Attached or Detached | 24 hrs | Medium | Order → |
| ADU / Guest House | 24–48 hrs | Complex | Order → |
| Driveway Expansion | 12 hrs | Simple | Order → |
| Commercial Permits | 24–48 hrs | Complex | Order → |
| New Home Construction | 48 hrs | Complex | Order → |
My team has prepared over 10,000 permit-ready site plans for homeowners, contractors, pool companies, and developers across all 50 states.
We research the specific requirements of your city or county for every order — GIS parcel data, zoning setbacks, flood zones, special overlays, and the exact formatting your portal requires. If your plan is returned, we update it within 12 hours at no extra charge.
Six steps. You send us your address and project type — we handle the rest.
Send your property address, project type, and any permit comments from your building department.
GIS parcel data, lot dimensions, zoning setbacks, flood zones, and your county's exact submission format.
Drawn to scale, formatted for your portal, with all required elements for your project type.
You receive the plan, review it, and request any changes — typically turned around in a few hours.
Receive your permit-ready PDF, submit it to your building department, and move forward.
If the building department requests corrections, forward the notice. Updated within 12 hours, no charge.
And exactly how we prevent each one on every single plan we prepare.
The distance to each property line must be explicitly labeled. Missing even one triggers a correction. We label all four on every plan.
"Not to scale" plans are auto-rejected. We draw every plan to the correct scale with both written and graphic scale bars.
Reviewers cross-check against satellite imagery. Every structure must appear. We use GIS data to verify before drafting.
Required for pools, decks, driveways, and additions. We calculate and clearly show the math on every applicable plan.
LADBS, San Diego DSD, Orange County FastTrack, Miami-Dade ePlan — each has specific requirements. We know them all.
Every plan includes GIS-verified data, county-specific research, correct formatting, and free revisions. No hidden fees.
Simple residential projects (fence, shed, driveway) start at $79. Pool permits and ADUs are mid-range. Commercial and PE-stamped plans are priced higher. Get a free quote in minutes — no commitment.



We research the specific requirements of your city or county for every single order. Deep expertise in every US jurisdiction.
All 67 county databases, HVHZ zones, FEMA flood zones, and F.S. 515.29 pool barrier compliance. Florida Site Plans →
ADU law (AB 2221), Coastal Zone, VHFHSZ fire zones, LADBS, San Diego DSD, all major CA markets. California Guide →
We look up your specific zoning setbacks, overlay districts, and portal formatting requirements for every single order — no templates.
Everything you need to know before you order.
Deep-dive guides on every permit type, jurisdiction, and site plan requirement — written by our engineering team.
Send us your address and project type. We handle the GIS research, setback calculations, correct formatting — and free revisions until your permit is approved.