Whether you're adding a pool, building a fence, converting a garage, or planning an ADU — your city or county needs a site plan before they'll issue a permit. We prepare yours from scratch, county-specific, delivered as a permit-ready PDF in 12–24 hours.



A residential site plan is a scaled, top-down drawing of your property showing where your home sits on the lot, what other structures exist, and exactly where your proposed project will be placed — with all distances from property lines labeled.
Building departments use it to confirm your project meets local zoning rules before issuing a permit. Without it, the permit application cannot be reviewed.
Need a Residential Site Plan?
Starting from $79. Delivered in 12–24 hours. Free revisions included.
Every permit type below is prepared from scratch for your specific county — not from a template. GIS-verified, correctly scaled, formatted for your portal.
Pool location, water edge setbacks to all property lines, safety barrier location and height, gate details, equipment pad, impervious surface including pool deck.
Pool Permit Guide →Fence line location, height labeled, gate locations, corner lot sight triangle if applicable. If serving as a pool barrier, full F.S. 515.29 compliance notation included.
Fence Permit Guide →Shed placement, all setbacks from property lines, distance from main house, foundation type, and wind compliance notation where required by jurisdiction.
Shed Permit Guide →Deck dimensions, height above grade, attachment point to house, all four setbacks, and impervious surface impact calculation.
Deck Permit Guide →
Existing house footprint, proposed addition footprint, connection point, all setbacks, and updated impervious surface calculation.
Addition Guide →Attached and detached garage setbacks (principal or accessory standards depending on type), driveway connection, and impervious surface.
Garage Guide →ADU location, setbacks (state ADU law minimums where applicable — CA 4 ft), parking, utility connections, lot coverage, and street access.
ADU Guide →Expanded driveway area, connection to street, curb cut notation, and impervious surface calculation showing before-and-after coverage.
Driveway Guide →No hidden fees. Free revisions on corrections. Every plan includes GIS-verified data, county setback research, and correct portal formatting.
| Permit Type | Delivery | Starting From | Action |
|---|---|---|---|
| Fence permit | ⚡ 12 hours | $79 | Order → |
| Shed permit | ⚡ 12 hours | $79 | Order → |
| Basic driveway | ⚡ 12 hours | $79 | Order → |
| Pool permit | ⚡ 12–24 hours | $149 | Order → |
| Deck / patio | ⚡ 12–24 hours | $149 | Order → |
| Home addition | ⚡ 24 hours | $149 | Order → |
| Garage addition | ⚡ 24 hours | $149 | Order → |
| ADU site plan | ⚡ 24–48 hours | $249 | Order → |
Our 99% first-submission approval rate across 10,000+ plans comes from one thing: we do the research every other service skips.
Engineer Wasim, Founder
10,000+ residential site plans delivered since 2021. All 50 states. 99% first-submission approval rate.
Setbacks in Hillsborough County, FL are different from Orange County, FL. We look up your exact zoning district before drafting begins — not a template.
Your lot dimensions come from official county parcel records — not scaled from satellite imagery. Accurate boundaries every time.
LADBS PermitLA, Orange County FastTrack, Miami-Dade BDFD, San Diego OpenDSD — we format your plan for your portal's exact requirements.
Correction notice from the building department? Forward it. We fix and redeliver within 12 hours at no charge. Every order, every time.
You don't need a surveyor. You don't need to understand CAD. You don't need to schedule an appointment or have anyone visit your property. Submit your address and project type — we handle the rest.
If you're pulling multiple permits per month, we're your drafting department. Pool companies, fence installers, contractors, and permit expediters send us projects every day.
"Site Plans Online USA made the process simple and fast. I sent my property details and received a clean permit-ready site plan the next day."Pablo P. Pool Permit · Florida
"We use Site Plans Online USA when clients need fast site plan drafting. Communication is clear, and the plans are easy to review and submit."Pool Company Multiple Projects · Texas
"Thank you so much for your help with everything, the new site plan has been submitted and hopefully all is good."Patricia B. Garage Permit · DeKalb County, GA
Florida has specific requirements that differ from national standards. 67 counties each with their own portal formats, setback rules, and documentation requirements. Pool permits require F.S. 515.29 barrier compliance notes. HVHZ zones (Miami-Dade and Broward) require additional wind notation. FEMA flood zones are common across Florida.
Submit your address and project type. We research your county, prepare your plan, and deliver within 12–24 hours. 99% first-submission approval rate. Free revisions always included.
Florida clients: Site Plans FL — Florida's Permit Site Plan Specialist ↗
Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us: