REAL PROJECT | Residential site utility plan | Denver, Colorado | Design coordination documented

Project challenge
A residential alteration required utility and drainage annotations coordinated with existing openings and a small wall segment.
Verified scope and coordination
- Wall segment described as 8 ft 6 in by 8 ft; existing door 32 x 80 in and window 24 x 36 in were confirmed unchanged.
- Sewer cleanout beneath bathroom was identified; discharge was marked and downspout was directed to soil.
- SUDP cover sheet was added; NAVD88 reference and inspector confirmation remained requested.
Available project records
Project-specific design correspondence and drawing-revision history; private source drawings are not reproduced.
Current project status
Design revisions and SUDP cover coordination documented. Permit approval, final sealing and construction are not verified.
Practical permit takeaways
Confirm site measurements, existing conditions and local review requirements before preparing final construction documents. Engineering review and approvals must be verified separately.
Project case study PDF
View Project Case Study PDF — original project summary, not a signed permit plan.
Related services
Frequently asked questions
Was this project approved?
No approval is confirmed in the available project records.
Are these illustrations engineering drawings?
No. They explain documented coordination topics and are not construction instructions.
Discuss your permit drawing project with Site Plans Online USA