⚡ Rush Delivery · Same Day or Next Day

Site Plans
for a Permit — Done Right, Fast

Your city asked for a site plan before approving your building permit. You need it fast, formatted correctly, and accurate enough to pass first-time review. That’s exactly what we prepare.

Plans Delivered
+
Approval Rate
%
States

12-24hr Turnaround

building permit process requiring elevation drawings for approval

12–24hr
Delivery

GIS-Verified Property Data

County-Specific Setback Research

Correct Format for Your Portal

Free Revisions if Rejected

All 50 US States

— OUR SERVICES

Residential, Commercial & PE-Stamped Plans

Every plan is drawn to scale, researched for your county, and formatted for your building department portal — starting from just $79.

Residential site plan for building permit approval with property layout and planning checklist

Residential

Residential Site Plans

Every plan is drawn to scale, researched for your county, and formatted for your building department portal — starting from just $79.

Florida PE stamped site plan for residential and commercial building permit approval

Commercial

Commercial Site Plans

Full commercial permit packages including parking layout, ADA spaces, fire lanes, drainage notes, and PE stamp for jurisdictions that require engineer sign-off.

Residential site plan for building permit approval with property layout and planning checklist

PE Stamped

PE-Stamped Plans

Some jurisdictions — especially commercial, ADU, and structural projects — require a Professional Engineer’s stamp. We provide PE-stamped site plans for any state.

Residential site plan drawing for permit approval and property development

Permit Ready

— What Is It?

What Is a Site Plan for a Permit?

A site plan for a permit is a scaled, top-view drawing of your property. The building department uses it to confirm your project complies with local zoning rules — setbacks and lot coverage. Without it, there’s nothing to review.

Property boundaries and lot dimensions

All existing structures — house, garage, shed, pool, driveway

Your proposed project — exact location and dimensions

All four setback distances — front, rear, left, right

Project-specific elements required by your building department

— Requirements

What Every Permit Site Plan Must Include

Required by every US building department without exception. Missing even one element causes a rejection and delays your permit.

Property Boundaries

All lot lines measured in feet with dimensions labeled

Parcel ID / APN

County property identifier — must match records exactly

Address + Legal Description

From county appraiser records, adjacent street names

North Arrow + Scale

Written scale AND graphic scale bar — both required

All Existing Structures

Every structure on the lot, dimensioned — GIS cross-checked

Proposed Project

Labeled "PROPOSED," dimensioned, all four setbacks shown

Title Block

Address, APN, owner name, preparer, date, scale

Impervious Surface Calc

Required for pools, decks, driveways, and most additions

— Services

Common Projects That Need a Site Plan

Every order includes GIS-verified data, county-specific setback research, and correct formatting for your building department portal.

PROJECT TYPE TURNAROUND COMPLEXITY ACTION
Pool or Spa 12–24 hrs Medium Order →
Fence or Wall 12 hrs Simple Order →
Shed or Accessory Structure 12 hrs Simple Order →
Deck or Patio 12–24 hrs Simple Order →
Home Addition 24 hrs Medium Order →
Garage — Attached or Detached 24 hrs Medium Order →
ADU / Guest House 24–48 hrs Complex Order →
Driveway Expansion 12 hrs Simple Order →
Commercial Permits 24–48 hrs Complex Order →
New Home Construction 48 hrs Complex Order →
Professional site plan engineer providing residential and commercial permit planning services

10,000+ Plans Delivered

— About the Founder

I’m Engineer Wasim , Founder of Site Plans Online USA

My team has prepared over 10,000 permit-ready site plans for homeowners, contractors, pool companies, and developers across all 50 states.

We research the specific requirements of your city or county for every order — GIS parcel data, zoning setbacks, flood zones, special overlays, and the exact formatting your portal requires. If your plan is returned, we update it within 12 hours at no extra charge.

— How It Works

From Order to Permit-Ready PDF

Six steps. You send us your address and project type — we handle the rest.

Submit Your Details

Send your property address, project type, and any permit comments from your building department.

We Research Your Property

GIS parcel data, lot dimensions, zoning setbacks, flood zones, and your county's exact submission format.

We Draft Your Site Plan

Drawn to scale, formatted for your portal, with all required elements for your project type.

You Review

You receive the plan, review it, and request any changes — typically turned around in a few hours.

You Submit

Receive your permit-ready PDF, submit it to your building department, and move forward.

Free Revisions if Needed

If the building department requests corrections, forward the notice. Updated within 12 hours, no charge.

— Why Plans Fail

5 Reasons Plans Get Rejected

And exactly how we prevent each one on every single plan we prepare.

01

Missing Setback Dimensions

The distance to each property line must be explicitly labeled. Missing even one triggers a correction. We label all four on every plan.

02

Not Drawn to Scale

“Not to scale” plans are auto-rejected. We draw every plan to the correct scale with both written and graphic scale bars.

03

Existing Structures Missing

Reviewers cross-check against satellite imagery. Every structure must appear. We use GIS data to verify before drafting

04

No Impervious Surface Calc

Required for pools, decks, driveways, and additions. We calculate and clearly show the math on every applicable plan.

05

Wrong Portal Format

LADBS, San Diego DSD, Orange County FastTrack, Miami-Dade ePlan — each has specific requirements. We know them all.

— Pricing

Transparent Pricing, No Surprises

Every plan includes GIS-verified data, county-specific research, correct formatting, and free revisions. No hidden fees.

Site Plans Starting From

Simple residential projects (fence, shed, driveway) start at $79. Pool permits and ADUs are mid-range. Commercial and PE-stamped plans are priced higher. Get a free quote in minutes — no commitment.

$79

Simple residential · All-inclusive

Trusted & Verified By

24-hour fast turnaround for residential and commercial site plan services
100% money back guarantee on professional residential and commercial site plan services
100% satisfaction guaranteed for professional residential and commercial site plan services

— Coverage

We Serve All 50 States

We research the specific requirements of your city or county for every single order. Deep expertise in every US jurisdiction.

Alabama

Alaska

Arizona

Arkansas

Colorado

Connecticut

Delaware

Georgia

Hawaii

Idaho

Illinois

Indiana

Iowa

Kansas

Kentucky

Louisiana

Maine

Maryland

Massachusetts

Michigan

Minnesota

Mississippi

Missouri

Montana

Nebraska

Nevada

New Hampshire

New Jersey

New Mexico

New York

N. Carolina

N. Dakota

Ohio

Oklahoma

Oregon

Pennsylvania

Rhode Island

S. Carolina

S. Dakota

Tennessee

Texas

Utah

Vermont

Virginia

Washington

W. Virginia

Wisconsin

Wyoming

Florida — Deep Expertise

All 67 county databases, HVHZ zones, FEMA flood zones, and F.S. 515.29 pool barrier compliance. Florida Site Plans →

California — Full Coverage


ADU law (AB 2221), Coastal Zone, VHFHSZ fire zones, LADBS, San Diego DSD, all major CA markets.
California Guide →

Every County Researched

We look up your specific zoning setbacks, overlay districts, and portal formatting requirements for every single order — no templates.

— FAQ

Frequently Asked Questions

Everything you need to know before you order.

How fast can I get a site plan for a permit?

Standard residential site plans are delivered within 12–24 hours. Rush same-day delivery is available — contact us before ordering to confirm availability.

No. We use GIS data and parcel records for most residential permits. If you have a survey, we incorporate it. You don’t need to obtain one first.

We prepare fence permit site plans — usually delivered in 12 hours. They include fence line location, height, gate locations, and sight triangle for corner lots.

In most US jurisdictions, they’re the same document. Building departments use both terms to describe a scaled, top-view drawing of your lot showing existing and proposed structures.

Yes. Send us your correction notice and we’ll prepare updated drawings within 12 hours. We handle permit rejections every day and know exactly what reviewers are looking for.

Yes. Commercial site plans include parking layout with ADA spaces, fire lane, drainage notes, and PE stamp where required. Contact us to discuss your specific project.

— Resources

Learn From Our Expert Guides

Deep-dive guides on every permit type, jurisdiction, and site plan requirement — written by our engineering team.

FOUNDATION

What is Site Plan?Complete Guide for Homeowners

Site Plan for a Pool Permit – What’s Requird

FENCE PERMITS

Fence Permit Site Plan Guide – All Requirements

ADU

ADU Site Plan Guide – Permits, Setbacks & Requirements

REJECTIONS

Why Site Plans Get Rejected (And How To Fix It)

PRICING

How Much Does a Site Plan Cost? Complete Price Guide

CALIFORNIA

Site Plan for a Permit in California – Full State Guide

FLORIDA

Site Plans for Florida Permits — All 67 Counties

DEFINITIONS

Site Plan vs Survey vs Plot Plan — What’s the Difference?

PE STAMP

PE-Stamped Plans for Permits — When You Need One

REQUIREMENTS

Site Plan Drawing Requirements for Building Permits

RESIDENTIAL

Residential Site Plans for Permits — Complete Guide

COMMERCIAL

Commercial Site Plans for Permits USA

DECK

Deck Permit Plot Plan Guide — What to Include

HOW-TO

How to Get a Site Plan of My Property

SHED

Shed Permit Site Plan — Requirements & Examples

GARAGE

Garage Addition Site Plan Guide

DRIVEWAY

Driveway Expansion Permit Site Plan Requirements

CHECKLIST

Construction Site Plan Checklist — Everything Required

ADDITION

Site Plan for House Addition or Remodel

ADU

ADU Feasibility Study — Before You Permit

CERTIFICATION

Certified vs Non-Certified Site Plan — Which Do You Need?

PROCESS

The Site Plan Review Process Explained

ONLINE

How to Get a Site Plan Online — Fast & Easy

REQUIREMENTS

Site Plan Requirements for Building Permits — By State

Non-Certified Site Plans for Permits in USA

CALIFORNIA

California Site Plan Guide — ADU, Coastal, Fire Zones

HOW-TO

How to Get a Site Plan for a Permit in the USA

COMPLIANCE

City-Compliant Site Plan Services — How We Ensure Approval

PRICING

Affordable Site Plan Services — Quality Without the Cost

DIY VS PRO

DIY vs Professional Site Plan — Which Should

GUIDE

Site Plan Guide — Everything You Need to Know

ZONING

Zoning Laws for Pools, Fences & Decks — What

READING PLANS

How to Read a Site Plan — Guide for Homeowners

LANDSCAPING

What Is a Landscaping Site Plan?

CONDITIONAL USE

Conditional Use Permit Guide — Site Plan Requirements

FAST DELIVERY

Fast Site Plans — 24-Hour Turnaround Service

COVERAGE

Are Site Plan Companies Available in All 50 States?

PENNSYLVANIA

Pennsylvania Permit Site Plans — Requirements by County

ELEVATION PLANS

Elevation Plan Drawing Services — Nationwide

FLOOR PLANS

Floor Plans for Permits — What’s Required

REJECTIONS

City Plan Red Markups — How to Respond & Resubmit

COMMERCIAL

Commercial Site Plan for Planning Commission Review

PACKAGES

Site Plan Packages — What’s Included at Each Level

MAIN GUIDE

Site Plan for a Permit — Complete USA Guide

CERTIFICATION

Certified vs Non-Certified Site Plan — Which Do You Need?

PROCESS

The Site Plan Review Process Explained

ONLINE

How to Get a Site Plan Online — Fast & Easy

Ready to Get Your Permit Site Plan?

Send us your address and project type. We handle the GIS research, setback calculations, correct formatting — and free revisions until your permit is approved.

💬 Get a Site Plan

👋 Need a Site Plan?

Permit-ready plans delivered in 12–24 hours.
Choose how you'd like to reach us:

WhatsApp Us Email Us